KYTC Logo
Truck Restrictions
I‑24 I‑64 I‑65 I‑71 I‑75 I‑264 I‑265 I‑275 I‑471
See All Numbered Highways
Truck Restrictions—Statewide
Map of Statewide Between US 60; Versailles Road and US 421; Leestown Road. Look out for construction work. A mandatory speed limit is in force. A detour is not available. Blasting is in progress. Advisory speed limit 45 MPH. Width limit 11'0". From 8:00PM EDT to 7:00AM EDT on Fridays and from 7:00PM EDT to 7:00AM EDT on weekends, Mondays, Tuesdays, Wednesdays and Thursdays. Between Old Main Street and Harper Cemetery Road. Bridge construction work is in progress. Construction traffic may be merging. For a long period. Between KY 334 and Daviess, Hancock County Line. Road construction work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. The road is being repaved. Look out for flaggers. Speed limit 45 MPH. Until August 1. Between Mile Point 58 in Hart County and Mile Point 82 in Hardin County. Look out for long term road construction work. For a long period. Between Mile Point 8 in Laurel County and Mile Point 14 in Clay County. Look out for construction work. Look out for brush control operations. Speed restrictions are in force. Speed limit 45 MPH. Until April 30. Between Exit 7: US 42; Story Avenue and I-65. The roadway is reduced to one lane. The road is being repaved. Between Mile Point 98 in Fayette County and Mile Point 82 in Madison County. The road is being repaved. The left lane is closed. Expect delays. From 7:30AM EDT to 5:30PM EDT on weekdays. For the next six months. Between South Park Road; East Manslick Drive and KY 1065; Outer Loop. Road maintenance work is in progress. A lane is blocked. From 9:00AM EDT to 3:00PM EDT daily. For the next two months. Between Mile Point 10 in Mercer County and Mercer, Jessamine County Line. There are alternating lane closures. Look out for brush control operations. Look out for flaggers. From 8:00AM EDT to 5:00PM EDT on weekdays. Between Mile Point 64 in Rockcastle County and Mile Point 68 in Rockcastle County. The roadway is reduced to one lane because the road is being repaved. Expect delays of uncertain duration. From 6:00PM EDT to 12:00PM EDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays. Until June 30. Between Office Park Drive and Collins Lane. Road construction work is in progress. Expect changing traffic patterns. The roadway is reduced to one lane. The roadway is shared with opposing traffic. Reduce your speed. Speed limit 35 MPH. Until November 30. Between Mile Point 44 in Carroll County and Exit 44: KY 227. Bridge maintenance work is in progress. A lane is blocked. Expect delays. From 7:00PM EDT to 7:00AM EDT daily. Until July 31. Between Mile Point 72 in Russell County and KY 80. The roadway is reduced to one lane. Road maintenance work is in progress. Expect changing traffic patterns. There is a width limit in effect. Consider using an alternate route. Speed limit 55 MPH. Width limit 11'0". For the next month. Between US 60; US 60 and US 60; US 60. A lane is closed intermittently. Look out for construction work. Until October 15, 2016. Between Fleming, Rowan County Line and Park Hills Drive. The road is being repaved. Look out for flaggers. For the next two months. Between Exit 12: I-264 and Exit 19: I-265; Gene Snyder Freeway. Road maintenance work is in progress. A lane is blocked. Speed limit 55 MPH. From 8:00PM EDT to 6:00AM EDT daily. Between Maple Spring Drive and I-265. A lane is blocked. Road construction work is in progress. From 7:00PM EDT to 5:00AM EDT on weekdays. For the next two months. Between Mile Point 16 in Caldwell County and KY 109. Road construction work is in progress. A lane is closed intermittently. Until September 1. Between Brighton Street and 9th Street. Road construction work is in progress. A lane is blocked. Expect delays. Until June 30, 2016. Between Mile Point 20 in Oldham County and Mile Point 22 in Oldham County. Bridge construction work is in progress. Expect changing traffic patterns. A lane is blocked. Expect delays. Speed limit 60 MPH. Until September 30. Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period.
KY 4 in both directions: Construction work, a mandatory speed limit is in force, no detour available, blasting.
Cumberland Parkway in both directions: Roadway reduced to one lane, road maintenance operations, changing traffic patterns, width limit in effect, consider using an alternate route.
US 60 in both directions: Roadway reduced to one lane, right lane blocked, detour in operation, repairs are in progress.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp