KYTC Logo
Truck Restrictions
I‑24 I‑64 I‑65 I‑71 I‑75 I‑264 I‑265 I‑275 I‑471
See All Numbered Highways
Truck Restrictions—Statewide
Map of Statewide Between Exit 137: I-64 and Milepoint 138. The bridge is closed. Repairs are in progress. A detour is in operation. For the next five months. Between Exit 29 and Exit 25A-B: I-64. Multiple Waze users reported a heavy traffic jam. Between I-71 and KY 146. Road construction work is in progress. Expect delays. Speed limit 45 MPH. From 6:00PM EST to 6:00AM EST and from 9:00AM EST to 3:00PM EST daily. Until June 30, 2017. Between Exit 17: KY 913 and Milepoint 18. Multiple Waze users reported standstill traffic. Between Mile Point 18 in Fayette County and US 25. Multiple Waze users reported standstill traffic. Between US 25 and US 421. Multiple Waze users reported standstill traffic. Between Church St and Cedar St. Multiple Waze users reported standstill traffic. Between Hiltonia Park and Arcadia Park. Multiple Waze users reported standstill traffic. Between I-65; Cardin Ln and Mile Point 4 in Larue County. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Until May 31. Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018. Between W Broadway and S 1st St. A lane is closed because of road maintenance activities. Expect delays. From 9:00AM EST to 3:00PM EST on weekdays. For the next two weeks. Between Mile Point 16 in Fayette County and KY 4. Multiple Waze users reported standstill traffic. Between Milepoint 26 and Milepoint 32. Major road construction work is in progress. Blasting is in progress. Expect delays of uncertain duration. Speed limit 45 MPH. For a long period. Between Interstate Plaza Rd and Harper Cemetery Rd. Bridge construction work is in progress. Construction traffic may be merging. Until April 30. Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Speed limit 55 MPH. Until November 1, 2017. Between Milepoint 2 and US 42. Multiple Waze users reported a heavy traffic jam. Between Northwestern Pkwy and Exit 1: I-264. Multiple Waze users reported standstill traffic. Between Exit 32 and Exit 35A: I-71. Road construction work is in progress. A lane is closed intermittently. Expect delays. Until November 30. Between the start of I-24 and Milepoint 2. Bridge maintenance work is in progress. The roadway is reduced to one lane. The road is closed intermittently. Expect delays. Until May 30. Between Milepoint 10 and Exit 9A-B: I-265. Multiple Waze users reported standstill traffic. Between Exit 21: US 45B and Exit 52A-B: I-24. Road construction work is in progress. Road maintenance work is in progress. A lane is blocked. There is a width limit in effect. Expect delays. Width limit 15'0". Speed limit 55 MPH. Until March 31. Between the start of I-275 and Exit 74A-B: I-471. Multiple Waze users reported standstill traffic.
I-65 in both directions: Long term road construction, changing traffic patterns, width limit in effect, permitted oversize loads are prohibited.
I-65 in both directions: Bridge closed, repairs are in progress, detour in operation.
KY 55 in both directions: Road blocked, due to bridge construction work, detour in operation.
Purchase Parkway in both directions: Road construction, road maintenance operations, lane blocked, width limit in effect, delays.
KY 305: Road closed to traffic, due to bridge construction work, detour in operation, observe signs.
KY 152 in both directions: Bridge closed, road closed for repairs, detour in operation.
US 31W in both directions: Bridge construction, roadway reduced to one lane, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction