Truck Restrictions
I-65 Whole Road 1 report
Milepoint 0.0 to Milepoint 35.673 No reports
Milepoint 35.673 to Milepoint 125.24 1 report
Milepoint 125.24 to Milepoint 136.64 No reports
Truck Restrictions on I-65
Map of Reports on I-65 Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017. Between Exit 81: KY 84 and Milepoint 82. Multiple Waze users reported road construction. Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018. Between Exit 125A-B: I-265; KY 841 and Exit 133. Look out for mobile maintenance operations. Ramp restrictions are in force due to road marking work in progress. Be aware of narrow lanes. Expect delays. From 7:00PM EDT to 5:00AM EDT daily. Clearing this week. Between KY/IN Stateline; Milepoint 138 and Exit 137: I-64. Road construction work is in progress. Expect changing traffic patterns. The ramp is blocked. Until December 31.
I-65 in both directions: Long term road construction, changing traffic patterns, width limit in effect, permitted oversize loads are prohibited, slow traffic, delays.
Google Static Map Image
Closure Closure Restriction Restriction