KYTC Logo
Truck Restrictions on I-64
Map of Reports on I-64 Between Mile Point 64 in Woodford County and Mile Point 74 in Fayette County. The road is being repaved. A lane is closed. Speed restrictions are in force. Expect delays of uncertain duration. Until October 14. Between US 62 and Mile Point 74 in Fayette County. The left lane is blocked. Major road construction work is in progress. The road is being repaved. For the next two months. Between Mile Point 122 in Bath County and Mile Point 130 in Rowan County. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Fines are double in the work zone. Speed limit 55 MPH. Width limit 12'0". Until October 31. Between Mile Point 166 in Carter County and Mile Point 172 in Carter County. The roadway is reduced to one lane. Speed restrictions are in force. Expect delays. Fines are double in the work zone. Speed limit 55 MPH. Until tomorrow at about 11:59PM EDT.
I-64 eastbound: Right lane blocked, because of bridge maintenance work, delays.
I-64 eastbound: Left lane blocked, major road construction, paving operations.
I-64 in both directions: Roadway reduced to one lane, width limit in effect, speed restrictions in force, fines are double in the work zone.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp