KYTC Logo
Truck Restrictions
US 60 Whole Road 1 report
Wickliffe to Owensboro No reports
Owensboro to Louisville No reports
Louisville to Lexington 1 report
Lexington to Ashland No reports
Truck Restrictions on US 60
Map of Reports on US 60 Between Nugent Lane and Powers Lane. The roadway is reduced to one lane because of road maintenance activities. Expect delays. Until December 15. Between KY 55 and KY 53; Ashland Avenue. Road maintenance work is in progress. A lane is blocked because of work on the shoulder. Clearing this week. Between Crossfield Drive and KY 2865. The road is being repaved. The roadway is reduced to one lane. The left lane is blocked. From 8:00AM EDT to 4:30PM EDT daily. Until October 7. Between Industry Road and Elkhorn Drive. The roadway is reduced to one lane. Road maintenance work is in progress. Traffic signal maintenance work is in progress. Repairs are in progress. From 8:00PM EDT to 6:00AM EDT on weekdays. Until tomorrow at about 11:59PM EDT. Between Brickyard Road and KY 180; KY 180; KY 3294. The roadway is reduced to one lane. Expect single line traffic alternating directions. Look out for flaggers. Expect delays. For the next week.
US 60 in both directions: Paving operations, roadway reduced to one lane, left lane blocked.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp