KYTC Logo
I-65: Elizabethtown to Louisville
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24.
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-65: Elizabethtown to Louisville
Map of Reports on I-65 Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24. Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016. Between Brook Street; Muhammad Ali Boulevard and Exit 137: I-64; I 64. Look out for long term road construction work. The left lane is closed. The roadway is reduced to two lanes. Expect delays. For a long period.
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp