KYTC Logo
US 60: Louisville to Lexington
Between BG; KY 2863 and New Circle Road. Major road construction work is in progress. Expect changing traffic patterns. Truck restrictions are in force. Speed restrictions are in force. Fines are double in the work zone. Expect delays. Consider using an alternate route. For the next five months.
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 60: Louisville to Lexington
Map of Reports on US 60 Between Bayly Avenue and Meridian Avenue. The road is being repaved. A lane is blocked. Expect delays. From 7:30AM EDT to 4:30PM EDT on weekdays. Until Monday, at about 11:59PM EDT. Between KY 55; KY 53 and KY 1871. Road marking work is in progress. A lane is blocked. Expect delays. Clearing this week. Between Franklin, Woodford County Line and US 62; Mile Point 8 in Woodford County. The road is being repaved. The roadway is reduced to one lane. Expect delays of uncertain duration. Until November 15. Between BG; KY 2863 and New Circle Road. Major road construction work is in progress. Expect changing traffic patterns. Truck restrictions are in force. Speed restrictions are in force. Fines are double in the work zone. Expect delays. Consider using an alternate route. For the next five months.
US 60 in both directions: Major road construction, changing traffic patterns, truck restrictions in force, speed restrictions in force, fines are double in the work zone, delays, consider using an alternate route.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp