KYTC Logo
I-24: Illinois State Line to Eddyville
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-24: Illinois State Line to Eddyville
Map of Reports on I-24 Between Illinois State Line and Exit 3: KY 305. A lane is blocked. Road construction work is in progress. Expect delays. Speed limit 55 MPH. From 8:00PM EDT to 6:00AM EDT on weekdays. Until August 1. Between Mile Point 6 in McCracken County and Exit 3: KY 305. The roadway is reduced to one lane. Look out for construction work. From 8:00PM EDT to 6:00AM EDT on weekdays. Until August 1. Between Mile Point 20 in Marshall County and Exit 25: Purchase Parkway. The roadway is reduced to one lane because of road maintenance activities. Speed limit 55 MPH. For the next month.
Google Static Map Image
Closure Closure Restriction Restriction