KYTC Logo
Truck Restrictions on I-64
I-64
At Exit 15. The road is being repaved. The ramp is partially blocked. Expect delays. Until Monday, at about 6:00AM EDT.
At Exit 17: KY 913; Blankenbaker Road. The road is being repaved. The ramp is partially blocked. Expect delays. Until Monday, at about 6:00AM EDT.