KYTC Logo
US 25
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 25
Map of Reports on US 25 Between Casey Circle and KY 876. Look out for construction work. The roadway is reduced to one lane. Traffic is slow. Expect changing traffic patterns. Observe the signs. From 9:00AM EDT to 3:00PM EDT on weekdays. Until June 30. Between West 3rd Street and Michigan Street. Bridge maintenance operations. Lane blocked. Observe signs. From 6:30PM EDT to 12:00AM EDT on Monday, Tuesday and Wednesday. Starting 6:30PM EDT, 5/23/2013 until tomorrow at about 11:59PM EDT.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp