KYTC Logo
US 42
US 42 in both directions: Road construction, roadway reduced to one lane, ramp partially blocked, new road layout.
Between Bentley Court and I-75. Road construction work is in progress. The roadway is reduced to one lane. The ramp is partially blocked. Look out for a new road layout. Until October 31.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 42
Map of Reports on US 42 Between Bickel Avenue and Spring Street; Adams Street. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Expect delays. Speed limit 25 MPH. Until October 31. Between South Fork Road and Miller Owens Road. The road is being repaved. The roadway is reduced to one lane. Expect single line traffic alternating directions. Expect delays. Consider using an alternate route. Until tomorrow at about 11:59PM EDT. Between Bentley Court and I-75. Road construction work is in progress. The roadway is reduced to one lane. The ramp is partially blocked. Look out for a new road layout. Until October 31. Between I-75 and Scott Drive. The roadway is reduced to one lane. Road maintenance work is in progress. Expect delays. Consider using an alternate route. From 9:00PM EDT to 5:00AM EDT daily. Until October 31. Between I-75 and Hollywood Drive. Road maintenance work is in progress. The roadway is reduced to one lane. Expect delays. Consider using an alternate route. Ramp restrictions are in force. From 9:00PM EDT to 5:00AM EDT daily. Until October 31.
US 42 in both directions: Road construction, roadway reduced to one lane, ramp partially blocked, new road layout.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp