KYTC Logo
I-75
I-75: Road construction, lane blocked, delays, shoulder closed, width limit in effect.
Between Exit 181 and Milepoint 182. Road construction work is in progress. A lane is blocked. Expect delays. The shoulder is closed. There is a width limit in effect. Width limit 9'6". Until August 15.
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-75
Map of Reports on I-75 Between Milepoint 126 and Exit 129. Look out for mobile maintenance operations because of blasting work. The road is closed intermittently. The shoulder is closed. Expect delays. From 9:00AM EDT to 2:30PM EDT on Mondays, Tuesdays and Wednesdays. Until August 24. Between Exit 84: I-275 and Exit 188: US 25. The roadway is reduced to two lanes because the road is being repaved. Expect changing traffic patterns. Expect long delays. The ramp is blocked. Speed limit 45 MPH. Until November 30.
I-75: Road construction, lane blocked, delays, shoulder closed, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction