US 42 in both directions: Road construction, roadway reduced to one lane, ramp partially blocked, new road layout.
US 42 in both directions: Road construction.
Between Bentley Court and I-75. Road construction work is in progress. The roadway is reduced to one lane. The ramp is partially blocked. Look out for a new road layout. Until October 31.

Comment: • Periodic lane closures may occur as needed on Eastbound and Westbound U S 42 / 1 2 7. • Various traffic impacts will continue through October. • Watch for flaggers, trucks and construction equipment entering and exiting the Highway.
Last updated on September 26
US 42 in both directions: Road construction.
Map of US 42 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup Truck Ramp Truck Ramp