KYTC Logo
Pennyrile Parkway in both directions: Road construction.
Pennyrile Parkway in both directions: Road construction.
At KY 416. Road construction work is in progress. The roadway is reduced to one lane. The right lane is blocked. Expect delays. Until October 15.

Comment: The NB and SB ramps at the KY 416 interchange at Exit 68 will be blocked Sept 5-6 for paving, 7 am-4 pm each day. Motorists should self-detour via KY 425 and KY 56 to access US 41 to connect with KY 416.
Last updated on September 3