Map of Statewide Between US 460; North Maysville Street and US 60; US 60 East; Winchester Mount Sterling. The road is being repaved. A lane is closed. Expect delays. From 8:00AM EDT to 4:00PM EDT and from 9:00PM EDT to 7:00AM EDT daily. Until tomorrow at about 7:00AM EDT. Between KY 686; KY 686 and Oldham Road. The road is being repaved. A lane is closed. Expect delays. Look out for flaggers. From 8:00AM EDT to 3:30PM EDT and from 9:00PM EDT to 7:00AM EDT daily. Until August 9. Between KY 134 and Wheelrim Road. Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. Look out for temporary traffic lights. There is a width limit in effect. Width limit 12'0". For a month. Between Mile Point 6 in Woodford County and US 60X. Road construction work is in progress. A lane is closed. Expect delays. Traffic is slow. Consider using an alternate route. From 8:00AM EDT to 4:30PM EDT daily. Until Tuesday, at about 4:30PM EDT. Between Mile Point 28 in Metcalfe County and Mile Point 32 in Metcalfe County. Bridge construction work is in progress. A lane is blocked. For the next four months. Between Old Main Street and Harper Cemetery Road. Bridge construction work is in progress. Construction traffic may be merging. For a long period. Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. Major road construction work is in progress. The shoulder is closed. For a long period. Between Mile Point 28 in Henry County and Henry, Trimble County Line. Road construction work is in progress. The road is being repaved. A lane is blocked. Traffic is heavy. Expect long delays. Speed restrictions are in force. Fines are double in the work zone. The ramp is blocked. Speed limit 55 MPH. Until October 31. Between Henry, Trimble County Line and Trimble, Carroll County Line. Road maintenance work is in progress. Bridge maintenance work is in progress. A lane is blocked. Expect delays. Speed restrictions are in force. Speed limit 55 MPH. Until September 30. Between R Glover Road and KY 839. Road construction work is in progress. Expect changing traffic patterns. Speed restrictions are in force. For the next week. Between Exit 9: KY 1865; Taylor Boulevard and Exit 10: KY 1020; Southern Parkway. Road maintenance work is in progress. There is work on the shoulder. For the next week. Between KY 7; Lynn; Southshore Road and Ohio State Line. Road construction work is in progress. A lane is closed. Look out for flaggers. Speed restrictions are in force. Fines are double in the work zone. Until August 31. Between Grant, Kenton County Line and Park Avenue. The road is being repaved. A lane is blocked. Repairs are in progress. Expect delays. For a month. Between Allison Avenue and Richardson Road. The road is blocked. Bridge construction work is in progress. A detour is in operation. Until September 30. Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24. Between 5th Street and Cane Run Road. The road is being repaved. The roadway is reduced to one lane. Observe the signs. From 7:00PM EDT to 6:00AM EDT daily. Until September 1. Between KY 914; KY 914 and KY 80; KY 80. The road is being repaved. A lane is closed. Expect delays. Consider using an alternate route. Until October 15. Between Campbell, Pendleton County Line and KY 1997. The road is being repaved. A lane is blocked. Expect delays. From 7:00AM EDT to 7:00PM EDT on weekdays. Until Monday, at about 11:59PM EDT. Between Clark, Montgomery County Line and Mile Point 112 in Montgomery County. Road maintenance work is in progress. A lane is blocked. The road is being repaved. Expect delays. Until today at about 11:59PM EDT. Between US 231; US 231 and KY 1543. Bridge construction work is in progress. The road is closed. A detour is in operation. Until today at about 11:59PM EDT. Between Holts Creek Road and Bracken, Pendleton County Line. The road is being repaved. A lane is blocked. Expect single line traffic alternating directions. Look out for flaggers. Until Monday, at about 11:59PM EDT. Between Bickel Avenue and Spring Street; Adams Street. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Expect delays. Speed limit 25 MPH. Until October 31. Between US 45X; 8th Street and Illinois State Line. The bridge is closed due to road construction work. A detour is in operation. Follow the signs. Expect delays. Until Monday, at about 11:59PM EDT. Between Mile Point 8 in Butler County and Mile Point 12 in Butler County. Road construction work is in progress. A lane is blocked. Consider using an alternate route. Expect delays. Speed limit 35 MPH. From 7:00AM EDT to 5:00PM EDT on weekdays. For the next week. Between Washington, Anderson County Line and Mile Point 54 in Mercer County. The road is being repaved. The left lane is blocked. Until October 15. Between KY 1198 and Oak Lane. Expect single line traffic alternating directions because of road maintenance activities. Observe the signals. Expect delays. For the next two weeks. Between KY 55 and KY 53; Ashland Avenue. Road maintenance work is in progress. A lane is blocked because of work on the shoulder. For the next three weeks. Between Mile Point 52 in Barren County and Mile Point 60 in Hart County. Look out for a slow moving maintenance vehicle. The road is closed intermittently. Traffic is slow because of blasting work. Expect delays. From 11:00AM EDT to 5:00PM EDT on weekdays. For the next week. Between Mile Point 20 in Oldham County and Mile Point 22 in Oldham County. Bridge construction work is in progress. Expect changing traffic patterns. A lane is blocked. Speed restrictions are in force. Fines are double in the work zone. Expect delays. Speed limit 60 MPH. Until September 30, 2015. Between KY 420 and KY 2261. The roadway is reduced to one lane because the road is being repaved. Speed restrictions are in force. Observe the signs. Speed limit 25 MPH. For the next month. Between Mile Point 166 in Carter County and Mile Point 172 in Carter County. The road is being repaved. The roadway is reduced to one lane. Speed restrictions are in force. Fines are double in the work zone. Expect delays. For the next three weeks. Between Mile Point 28 in Shelby County and KY 2861; Zaring Mill Road. Road construction work is in progress. The road is being repaved. A lane is blocked. Expect delays. The ramp is blocked. From 10:00PM EDT to 5:00AM EDT on Saturdays and from 7:00PM EDT to 5:00AM EDT on weekdays and Sundays. For the next three weeks. Between Tennessee State Line and Butt Road. Major road construction work is in progress. Expect single line traffic alternating directions. Look out for flaggers. Expect delays. Speed restrictions are in force. Until November 15. Between Crossfield Drive and KY 2865. The road is being repaved. The roadway is reduced to one lane. The left lane is blocked. From 8:00AM EDT to 4:30PM EDT daily. Until October 7. Between KY 154 and KY 2828; East Ivor Road. Road blocked. Repairs are in progress. Use a detour where possible. Starting 7:00AM EDT, 8/1/2014 until Monday, at about 7:00AM EDT. Between Mile Point 58 in Rockcastle County and Mile Point 68 in Rockcastle County. Road maintenance work is in progress. The roadway is reduced to one lane. Expect delays. From 6:00PM EDT to 7:00AM EDT on Thursdays and from 6:00PM EDT to 12:00PM EDT on Sundays, Mondays, Tuesdays and Wednesdays. Until August 25. Between I-64; I 64 and Goose Creek Road. The road is closed to traffic because of road maintenance activities. The road is open for local access only. A detour is in operation. Until today at about 9:00AM EDT. Between Exit 117: KY 44 and Mile Point 118 in Bullitt County. The left lane is closed due to bridge construction work. Expect delays. Speed restrictions are in force. Fines are double in the work zone. From 7:00AM EDT to 5:00PM EDT daily. For the next two weeks. Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period. Between Gardner Lane and Speed Avenue. Road maintenance work is in progress. A lane is blocked. From 8:30AM EDT to 3:30PM EDT on weekdays. For the next two weeks. Between Pinecrest Drive; Fraley Drive and Mabry Drive. The road is being repaved. The roadway is reduced to one lane. Expect delays. Until August 8.
KY 686 in both directions: Paving operations, lane closed, delays.
US 42 in both directions: Road construction, roadway reduced to one lane, ramp partially blocked, new road layout.
US 460 in both directions: Paving operations, lane closed, delays, look out for flaggers.
Mountain Parkway Extension in both directions: Bridge maintenance operations, roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights, width limit in effect.
US 60: Road construction, lane closed, delays, slow traffic, consider using an alternate route.
Cumberland Parkway in both directions: Bridge construction, lane blocked.
US 31W in both directions: Bridge construction, construction traffic merging.
US 68 in both directions: Bridge construction, lane blocked.
I-65 in both directions: Major road construction, shoulder closed.
I-71 southbound: Road construction, paving operations, lane blocked, heavy traffic, long delays, speed restrictions in force, fines are double in the work zone, ramp blocked.
I-71 southbound: Road maintenance operations, bridge maintenance operations, lane blocked, delays, speed restrictions in force.
US 31W in both directions: Road construction, lane blocked, look out for flaggers.
KY 90 in both directions: Road construction, changing traffic patterns, speed restrictions in force.
US 41A in both directions: Road construction, delays.
I-264 eastbound: Road maintenance operations, work on the shoulder.
Audubon Parkway eastbound: Roadway reduced to one lane, right lane blocked, bridge maintenance operations, reduce your speed.
KY 61 in both directions: Road construction, lane closed, delays.
KY 10: Road construction, lane closed, look out for flaggers, speed restrictions in force, fines are double in the work zone.
US 42 westbound: Roadway reduced to one lane, road maintenance operations, delays, consider using an alternate route.
US 60B in both directions: Road construction, roadway reduced to one lane, changing traffic patterns, delays.
US 62: Road blocked, bridge demolition work, and, bridge construction, detour in operation.
KY 80 in both directions: Road blocked, road construction, no through traffic, open for local access only.
US 25 in both directions: Paving operations, lane blocked, repairs are in progress, delays.
US 60 in both directions: Road construction, road closed intermittently, short delays, look out for flaggers.
KY 11 in both directions: Road blocked, bridge construction, detour in operation.
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
US 31 in both directions: Bridge closed, road construction, detour in operation, follow the signs.
US 27 in both directions: Paving operations, roadway reduced to one lane, observe signs.
US 27 in both directions: Paving operations, lane closed, delays, consider using an alternate route.
KY 9 northbound: Paving operations, lane blocked, delays.
I-65 northbound: Long term road construction, left lane closed, roadway reduced to two lanes, delays.
I-64 in both directions: Road maintenance operations, lane blocked, paving operations, delays.
KY 11 in both directions: Bridge construction, changing traffic patterns, reduce your speed.
US 62 in both directions: Bridge construction, road closed, detour in operation.
KY 9 southbound: Paving operations, lane blocked, single line traffic - alternating directions, look out for flaggers.
US 42: Bridge construction, roadway reduced to one lane, speed restrictions in force, delays.
US 45 in both directions: Bridge closed, due to road construction work, detour in operation, follow the signs, delays.
I-65 northbound: Ramp partially blocked, shoulder closed, due to road construction work, width limit in effect.
US 421 in both directions: Road construction, lane blocked, delays.
US 231 in both directions: Road construction, lane blocked, consider using an alternate route, delays.
US 127 in both directions: Road construction, bridge construction, speed restrictions in force, lane blocked.
KY 70 in both directions: Construction work, lane blocked, slow moving maintenance vehicle, trucks are entering the roadway.
Bluegrass Parkway in both directions: Paving operations, left lane blocked.
US 421 in both directions: Roadway reduced to one lane, work on underground services, delays.
US 60: Single line traffic - alternating directions, because of road maintenance activities, observe signals, delays.
US 60 in both directions: Road maintenance operations, lane blocked, because there is work on the shoulder.
US 42 eastbound: Road maintenance operations, roadway reduced to one lane, delays, consider using an alternate route, ramp restrictions in force.
I-65 in both directions: Slow moving maintenance vehicle, road closed intermittently, slow traffic, because of blasting work, delays.
I-71 southbound: Bridge construction, changing traffic patterns, lane blocked, speed restrictions in force, fines are double in the work zone, delays.
I-64 westbound: Construction work, lane closed, right shoulder closed.
Pennyrile Parkway in both directions: Road construction, roadway reduced to one lane, right lane blocked, delays.
I-64 eastbound: Exit ramp closed, because of construction work.
US 127 in both directions: Roadway reduced to one lane, because the road is being repaved, speed restrictions in force, observe signs.
I-65 southbound: Construction work, right lane closed.
US 421 in both directions: Bridge construction, lane blocked.
I-64 in both directions: Paving operations, roadway reduced to one lane, speed restrictions in force, fines are double in the work zone, delays.
I-64 in both directions: Road construction, paving operations, lane blocked, delays, ramp blocked.
US 31W in both directions: Major road construction, single line traffic - alternating directions, look out for flaggers, delays, speed restrictions in force.
US 60 in both directions: Paving operations, roadway reduced to one lane, left lane blocked.
KY 9 in both directions: Road blocked, repairs are in progress, use a detour where possible.
I-75 in both directions: Road maintenance operations, roadway reduced to one lane, delays.
US 60 in both directions: Road closed to traffic, because of road maintenance activities, open for local access only, detour in operation.
I-65 southbound: Left lane closed, due to bridge construction work, delays, speed restrictions in force, fines are double in the work zone.
KY 61 in both directions: Road construction, lane blocked.
US 31E in both directions: Road maintenance operations, lane blocked.
KY 32 in both directions: Paving operations, roadway reduced to one lane, delays.
I-71 southbound: Exit ramp closed, construction work.