KYTC Logo
Road Reports
I-65 Whole Road 6 reports
Tennessee State Line to Bowling Green No reports
Bowling Green to Elizabethtown 2 reports
Elizabethtown to Louisville 4 reports
Reports on I-65
Map of Reports on I-65 Between Bristow Friendship Church Road and Mile Point 32 in Warren County. The left lane is closed due to long term road construction work. For the next five months. Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. Major road construction work is in progress. The shoulder is closed. For a long period. Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24. Between Mile Point 112 in Bullitt County and Mile Point 120 in Bullitt County. The roadway is reduced to two lanes. Road construction work is in progress. Expect changing traffic patterns. The roadway is shared with opposing traffic. Speed limit 55 MPH. Width limit 16'0". Until December 31. Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016.
I-65 in both directions: Left lane closed, due to long term road construction work.
I-65 in both directions: Major road construction, shoulder closed.
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
I-65 in both directions: Roadway reduced to two lanes, road construction, changing traffic patterns, opposing traffic sharing the roadway.
I-65 southbound: Construction work, right lane closed.
I-65: Road construction, roadway reduced to two lanes, changing traffic patterns.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info