KYTC Logo
Reports on I-64
Map of Reports on I-64 Between US 62 and Mile Point 74 in Fayette County. The left lane is blocked. Major road construction work is in progress. The road is being repaved. For the next month. Between Mile Point 122 in Bath County and Mile Point 130 in Rowan County. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Fines are double in the work zone. Speed limit 55 MPH. Width limit 12'0". Until October 31.
I-64 eastbound: Exit ramp closed, because of construction work.
I-64 eastbound: Ramp blocked, paving operations, follow the detour signs.
I-64 eastbound: Left lane blocked, major road construction, paving operations.
I-64 in both directions: Roadway reduced to one lane, width limit in effect, speed restrictions in force, fines are double in the work zone.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info