KYTC Logo
Reports on US 60: Louisville to Lexington
US 60: Louisville to Lexington
Between Office Park Drive and Collins Lane. Road construction work is in progress. Expect changing traffic patterns. The roadway is reduced to one lane. The roadway is shared with opposing traffic. Reduce your speed. Speed limit 35 MPH. Until November 30.
Between Collins Lane and Leawood Drive. The roadway is reduced to one lane. The right lane is blocked. Repairs are in progress. Speed limit 35 MPH. For a month.
Between Sunset Drive and Laralan Avenue. A lane is blocked. Road maintenance work is in progress. Repairs are in progress. Expect delays. For a month.