Reports on I-65: Milepoint 35.673 to Milepoint 125.24
I-65: Milepoint 35.673 to Milepoint 125.24
--- Citizen Update ---
Between Warren, Barren County Line and KY 259. A Waze user reported road construction.
--- Citizen Update ---
Between Milepoint 48 and Exit 48. A Waze user reported road construction.
--- Citizen Update ---
Between Exit 53: KY 90 and Milepoint 53. A Waze user reported road construction.
At Milepoint 60. The rest area is closed.
Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017.
Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018.
--- Citizen Update ---
Between Milepoint 92 and US 31W. A Waze user reported road construction.
Between Bullitt, Jefferson County Line and Exit 135. Look out for mobile maintenance operations. A lane is blocked because of road maintenance activities. Expect delays. For the next three weeks.