KYTC Logo
US 60: Louisville to Lexington
US 60 in both directions: Road construction, changing traffic patterns, roadway reduced to one lane, opposing traffic sharing the roadway, reduce your speed.
Between Office Park Drive and Collins Lane. Road construction work is in progress. Expect changing traffic patterns. The roadway is reduced to one lane. The roadway is shared with opposing traffic. Reduce your speed. Speed limit 35 MPH. Until November 30.
US 60 eastbound: Work on the shoulder, right lane blocked.
Between Wellesley Heights Way and New Circle Road. There is work on the shoulder. The right lane is blocked. For a month.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 60: Louisville to Lexington
Map of Reports on US 60 Between Office Park Drive and Collins Lane. Road construction work is in progress. Expect changing traffic patterns. The roadway is reduced to one lane. The roadway is shared with opposing traffic. Reduce your speed. Speed limit 35 MPH. Until November 30.
US 60 in both directions: Road construction, changing traffic patterns, roadway reduced to one lane, opposing traffic sharing the roadway, reduce your speed.
US 60 eastbound: Work on the shoulder, right lane blocked.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info