KYTC Logo
US 60: Lexington to Ashland
US 60 in both directions: Roadway reduced to one lane, road maintenance operations, delays.
Between Industry Road and Elkhorn Drive. The roadway is reduced to one lane. Road maintenance work is in progress. Expect delays. From 7:00PM EDT to 6:00AM EDT daily. Until September 23.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 60: Lexington to Ashland
Map of Reports on US 60 Between Industry Road and Elkhorn Drive. The roadway is reduced to one lane. Road maintenance work is in progress. Expect delays. From 7:00PM EDT to 6:00AM EDT daily. Until September 23.
US 60 in both directions: Roadway reduced to one lane, road maintenance operations, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info