KYTC Logo
Reports on US 60: Louisville to Lexington
US 60: Louisville to Lexington
Between Office Park Drive and Collins Lane. Road construction work is in progress. Expect changing traffic patterns. The roadway is reduced to one lane. The roadway is shared with opposing traffic. Reduce your speed. Speed limit 35 MPH. Until November 30.
Between Wellesley Heights Way and New Circle Road. There is work on the shoulder. The right lane is blocked. For a month.