KYTC Logo
I-65: Elizabethtown to Louisville
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24.
I-65 in both directions: Roadway reduced to two lanes, because the road is being repaved, width limit in effect.
Between Exit 112: KY 245 and Mile Point 118 in Bullitt County. The roadway is reduced to two lanes because the road is being repaved. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 30.
I-65 southbound: Construction work, right lane closed.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016.
I-65 northbound: Long term road construction, roadway reduced to two lanes, delays.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. Look out for long term road construction work. The roadway is reduced to two lanes. Expect delays. From 9:00PM EDT to 5:00AM EDT on Fridays and Saturdays. Clearing this week.
I-65: Road construction, roadway reduced to two lanes, changing traffic patterns.
Between John F Kennedy Bridge and Indiana State Line. Road construction work is in progress. The roadway is reduced to two lanes. Expect changing traffic patterns. Until October 1, 2016.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-65: Elizabethtown to Louisville
Map of Reports on I-65 Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24. Between Exit 112: KY 245 and Mile Point 118 in Bullitt County. The roadway is reduced to two lanes because the road is being repaved. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 30. Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016. Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. Look out for long term road construction work. The roadway is reduced to two lanes. Expect delays. From 9:00PM EDT to 5:00AM EDT on Fridays and Saturdays. Clearing this week.
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
I-65 in both directions: Roadway reduced to two lanes, because the road is being repaved, width limit in effect.
I-65 southbound: Construction work, right lane closed.
I-65 northbound: Long term road construction, roadway reduced to two lanes, delays.
I-65: Road construction, roadway reduced to two lanes, changing traffic patterns.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info