KYTC Logo
Reports on I-65: Milepoint 35.673 to Milepoint 125.24
I-65: Milepoint 35.673 to Milepoint 125.24
--- Citizen Update ---
Between Edmonson, Barren County Line and Milepoint 44. A Waze user reported road construction.
At Milepoint 60. The rest area is closed.
Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017.
--- Citizen Update ---
At Milepoint 64. A Waze user reported road construction.
--- Citizen Update ---
Between Exit 81: KY 84 and Milepoint 82. A Waze user reported road construction.
--- Citizen Update ---
Multiple Waze users reported a road closure.
Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018.
--- Citizen Update ---
Between Milepoint 92 and US 31W. A Waze user reported road construction.