KYTC Logo
Reports on I-65: Milepoint 35.673 to Milepoint 125.24
I-65: Milepoint 35.673 to Milepoint 125.24
--- Citizen Update ---
Between Milepoint 36 and Exit 38: KY 101. A Waze user reported road construction.
--- Citizen Update ---
Between Barren, Edmonson County Line and Exit 43: Cumberland Parkway. A Waze user reported road construction.
--- Citizen Update ---
At Milepoint 60. A Waze user reported road construction.
At Milepoint 60. The rest area is closed.
--- Citizen Update ---
Between Milepoint 60 and Milepoint 62. A Waze user reported fog.
Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017.
--- Citizen Update ---
At Exit 65: US 31W. A Waze user reported road construction.
--- Citizen Update ---
Multiple Waze users reported a road closure.
Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018.
--- Citizen Update ---
Between Milepoint 82 and Milepoint 84. A Waze user reported road construction.
--- Citizen Update ---
Between Milepoint 92 and US 31W. A Waze user reported road construction.