KYTC Logo
KY 9: Maysville to I 64 at Grayson
KY 9 in both directions: Road construction, lane blocked, delays.
Between Brighton Street and 9th Street. Road construction work is in progress. A lane is blocked. Expect delays. Until June 30, 2016.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on KY 9: Maysville to I 64 at Grayson
Map of Reports on KY 9 Between Brighton Street and 9th Street. Road construction work is in progress. A lane is blocked. Expect delays. Until June 30, 2016.
KY 9 in both directions: Road construction, lane blocked, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info