KYTC Logo
US 68: Paducah to Bowling Green
US 68 in both directions: Bridge construction, roadway reduced to one lane, single line traffic - alternating directions, delays.
Between Mile Point 8 in Trigg County and Arrowhead Trail. Bridge construction work is in progress. The roadway is reduced to one lane. Expect single line traffic alternating directions. Expect delays. From 9:30AM EDT to 1:30PM EDT on Tuesdays and Fridays. Until April 30.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 68: Paducah to Bowling Green
Map of Reports on US 68
US 68 in both directions: Bridge construction, roadway reduced to one lane, single line traffic - alternating directions, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info