KYTC Logo
Reports on I-65
I-65
Between Bristow Friendship Church Road and Mile Point 32 in Warren County. The left lane is closed due to long term road construction work. For the next three months.
Between Mile Point 58 in Hart County and Mile Point 82 in Hardin County. Look out for long term road construction work. For a long period.
Between Mile Point 82 in Hardin County and Mile Point 84 in Hardin County. Look out for an accident.
Between Mile Point 118 in Bullitt County and Bullitt, Jefferson County Line. The roadway is reduced to two lanes. The road is being repaved. Look out for a new road construction layout. The roadway is shared with opposing traffic. Expect delays. Speed limit 55 MPH. Width limit 16'0". Until January 30, 2015.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. The roadway is reduced to one lane. Look out for construction work. From 9:00PM EST to 5:00AM EST on Fridays and Saturdays.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. The roadway is reduced to one lane. Look out for construction work. From 9:00PM EST to 5:00AM EST on Fridays and Saturdays.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. For a long period.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. Look out for construction work. The roadway is reduced to two lanes. For the next four months.
Between John F Kennedy Bridge and Indiana State Line. Road construction work is in progress. The roadway is reduced to two lanes. Expect changing traffic patterns. Until October 1, 2016.