KYTC Logo
US 421
US 421 in both directions: Road construction, roadway reduced to one lane, delays.
At KY 4; New Circle Road. Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Until December 1.
US 421 in both directions: Bridge maintenance operations, lane blocked, temporary traffic lights.
At I-71. Bridge maintenance work is in progress. A lane is blocked. Look out for temporary traffic lights. For the next two weeks.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 421
Map of Reports on US 421
US 421 in both directions: Road construction, roadway reduced to one lane, delays.
US 421 in both directions: Bridge maintenance operations, lane blocked, temporary traffic lights.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info