I-65 northbound: Road construction. --- Citizen Update ---
Between Exit 28: KY 446 and Milepoint 30. A Waze user reported road construction.
I-65 southbound: Rest area closed.
At Milepoint 60. The rest area is closed.
I-65 in both directions: Long term road construction, changing traffic patterns, width limit in effect, permitted oversize loads are prohibited, slow traffic, delays.
Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017.
I-65 in both directions: Long term road construction.
Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018.
I-65 in both directions: Intermittent lane closure, because of bridge maintenance work, delays.
At KY 1747. A lane is closed intermittently because of bridge maintenance work. Expect delays. From 9:00PM EDT to 5:00AM EDT on weekdays. For the next week.
I-65 northbound: Road construction. --- Citizen Update ---
At KY 1747. A Waze user reported road construction.
S Hancock St: Road closure. --- Citizen Update ---
Multiple Waze users reported a road closure.
N Hancock St: Road closure. --- Citizen Update ---
Multiple Waze users reported a road closure.
I-65 southbound: Bridge closed, because the road is being repaved, because of road maintenance activities, follow the detour signs, delays.
Between KY/IN Stateline; Milepoint 138 and Exit 137: I-64. The bridge is closed because the road is being repaved and because of road maintenance activities. Follow the detour signs. Expect delays. Until October 31.
I-65: Bridge construction, changing traffic patterns, follow the detour signs.
At Exit 137: I-64. Bridge construction work is in progress. Expect changing traffic patterns. Follow the detour signs. Until December 31.
I-65 southbound: Road construction. --- Citizen Update ---
Between Exit 137: I-64 and Exit 137: I-64. Multiple Waze users reported road construction.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-65
Map of Reports on I-65 Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017. Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018. Between KY/IN Stateline; Milepoint 138 and Exit 137: I-64. The bridge is closed because the road is being repaved and because of road maintenance activities. Follow the detour signs. Expect delays. Until October 31.
I-65 northbound: Road construction.
I-65 southbound: Rest area closed.
I-65 in both directions: Long term road construction, changing traffic patterns, width limit in effect, permitted oversize loads are prohibited, slow traffic, delays.
I-65 in both directions: Long term road construction.
I-65 in both directions: Intermittent lane closure, because of bridge maintenance work, delays.
I-65 northbound: Road construction.
S Hancock St: Road closure.
N Hancock St: Road closure.
I-65 southbound: Bridge closed, because the road is being repaved, because of road maintenance activities, follow the detour signs, delays.
I-65: Bridge construction, changing traffic patterns, follow the detour signs.
I-65 southbound: Road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction Hazard Waze: Hazard
Accident Waze: Accident Closure Waze: Closure Flooding Flooding