KYTC Logo
Reports on I-75
I-75
Between Mile Point 14 in Whitley County and Exit 15: US 25W; US 25W. Bridge maintenance work is in progress. The roadway is reduced to one lane. There is a width limit in effect. A detour is in operation. Width limit 12'0". Until tomorrow at about 5:00PM EDT.
Between Mile Point 30 in Laurel County and Mile Point 34 in Laurel County. The road is being repaved. The roadway is reduced to one lane. The left lane is blocked. Until tomorrow at about 5:00PM EDT.
Between Mile Point 58 in Rockcastle County and Mile Point 68 in Rockcastle County. Road maintenance work is in progress. A lane is closed. Expect delays. Until November 30.
At Exit 118. The exit ramp is closed because the road is being repaved. A detour is in operation. Follow the signs. Until today at about 11:59PM EDT.
At I-71; Ohio State Line. Bridge maintenance work is in progress. There are alternating lane closures. Until November 15.