KYTC Logo
Reports on I-65
I-65
Between Bristow Friendship Church Road and Mile Point 32 in Warren County. The left lane is closed due to long term road construction work. For the next four months.
Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. The shoulder is closed due to long term road construction work. For a long period.
Between Exit 65: US 31W; US 31W; Cave City; Horse Cave Road and Mile Point 66 in Hart County. Look out for a disabled vehicle. A lane is blocked.
Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until tomorrow at about 11:59PM EST.
Between Mile Point 112 in Bullitt County and Bullitt, Jefferson County Line. The roadway is reduced to two lanes. The road is being repaved. Expect changing traffic patterns. The roadway is shared with opposing traffic. Expect delays. Speed limit 55 MPH. Width limit 16'0". Until December 31.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. The roadway is reduced to one lane. Look out for construction work. From 9:00PM EST to 5:00AM EST on Fridays and Saturdays.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. The roadway is reduced to one lane. Look out for construction work. From 9:00PM EST to 5:00AM EST on Fridays and Saturdays.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. For a long period.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. Look out for construction work. The roadway is reduced to two lanes. For the next five months.
Between John F Kennedy Bridge and Indiana State Line. Road construction work is in progress. The roadway is reduced to two lanes. Expect changing traffic patterns. Until October 1, 2016.