KYTC Logo
I-65
I-65 in both directions: Slow moving maintenance vehicle, road closed intermittently, slow traffic, because of blasting work, delays.
Between Mile Point 52 in Barren County and Mile Point 60 in Hart County. Look out for a slow moving maintenance vehicle. The road is closed intermittently. Traffic is slow because of blasting work. Expect delays. From 11:00AM EDT to 5:00PM EDT on weekdays. For the next week.
I-65 northbound: Ramp partially blocked, shoulder closed, due to road construction work, width limit in effect.
At Exit 58: KY 218; Northtown; Horse Cave Road. The ramp is partially blocked. The shoulder is closed due to road construction work. There is a width limit in effect. Width limit 12'0". For the next week.
I-65 in both directions: Major road construction, shoulder closed.
Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. Major road construction work is in progress. The shoulder is closed. For a long period.
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24.
I-65 in both directions: Roadway reduced to two lanes, because the road is being repaved, width limit in effect.
Between Mile Point 106 in Bullitt County and Mile Point 112 in Bullitt County. The roadway is reduced to two lanes because the road is being repaved. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 30.
I-65 southbound: Left lane closed, due to bridge construction work, delays, speed restrictions in force, fines are double in the work zone.
Between Exit 117: KY 44 and Mile Point 118 in Bullitt County. The left lane is closed due to bridge construction work. Expect delays. Speed restrictions are in force. Fines are double in the work zone. From 7:00AM EDT to 5:00PM EDT daily. For the next two weeks.
I-65 southbound: Construction work, right lane closed.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016.
I-65 northbound: Long term road construction, left lane closed, roadway reduced to two lanes, delays.
Between Brook Street; Muhammad Ali Boulevard and Exit 137: I-64; I 64. Look out for long term road construction work. The left lane is closed. The roadway is reduced to two lanes. Expect delays. For a long period.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-65
Map of Reports on I-65 Between Mile Point 52 in Barren County and Mile Point 60 in Hart County. Look out for a slow moving maintenance vehicle. The road is closed intermittently. Traffic is slow because of blasting work. Expect delays. From 11:00AM EDT to 5:00PM EDT on weekdays. For the next week. Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. Major road construction work is in progress. The shoulder is closed. For a long period. Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24. Between Mile Point 106 in Bullitt County and Mile Point 112 in Bullitt County. The roadway is reduced to two lanes because the road is being repaved. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 30. Between Exit 117: KY 44 and Mile Point 118 in Bullitt County. The left lane is closed due to bridge construction work. Expect delays. Speed restrictions are in force. Fines are double in the work zone. From 7:00AM EDT to 5:00PM EDT daily. For the next two weeks. Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016. Between Brook Street; Muhammad Ali Boulevard and Exit 137: I-64; I 64. Look out for long term road construction work. The left lane is closed. The roadway is reduced to two lanes. Expect delays. For a long period.
I-65 in both directions: Slow moving maintenance vehicle, road closed intermittently, slow traffic, because of blasting work, delays.
I-65 northbound: Ramp partially blocked, shoulder closed, due to road construction work, width limit in effect.
I-65 in both directions: Major road construction, shoulder closed.
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
I-65 in both directions: Roadway reduced to two lanes, because the road is being repaved, width limit in effect.
I-65 southbound: Left lane closed, due to bridge construction work, delays, speed restrictions in force, fines are double in the work zone.
I-65 southbound: Construction work, right lane closed.
I-65 northbound: Long term road construction, left lane closed, roadway reduced to two lanes, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info