KYTC Logo
US 421
US 421 in both directions: Road construction, roadway reduced to one lane, delays.
At KY 4; New Circle Road. Road construction work is in progress. The roadway is reduced to one lane. Expect delays. Until December 1, 2015.
US 421 in both directions: Road marking operations, lane blocked, delays.
Between I-71 and Henry, Trimble County Line. Road marking work is in progress. A lane is blocked. Expect delays. For the next two weeks.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 421
Map of Reports on US 421 Between I-71 and Henry, Trimble County Line. Road marking work is in progress. A lane is blocked. Expect delays. For the next two weeks.
US 421 in both directions: Road construction, roadway reduced to one lane, delays.
US 421 in both directions: Road marking operations, lane blocked, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info