KYTC Logo
I-65
I-65 in both directions: Left lane closed, due to road construction work, delays.
Between Exit 28: KY 446 and Milepoint 32. The left lane is closed due to road construction work. Expect delays. For the next month.
I-65 southbound: Rest area closed.
At Milepoint 60. The rest area is closed.
I-65 in both directions: Long term road construction, changing traffic patterns, width limit in effect, permitted oversize loads are prohibited, slow traffic, delays.
Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017.
I-65 northbound: Road construction. --- Citizen Update ---
Between Exit 65: US 31W and Milepoint 66. A Waze user reported road construction.
I-65 northbound: Car stopped on roadway. --- Citizen Update ---
Between Milepoint 72 and Milepoint 74. A Waze user reported a car stopped on the roadway.
I-65 in both directions: Long term road construction.
Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018.
I-65 southbound: Road construction. --- Citizen Update ---
At US 31W. A Waze user reported road construction.
I-65 northbound: Road construction. --- Citizen Update ---
Between Exit 102: KY 313 and Hardin, Bullitt County Line. A Waze user reported road construction.
I-65 in both directions: Mobile maintenance operations, lane blocked, because of road maintenance activities, delays.
Between Bullitt, Jefferson County Line and Exit 135. Look out for mobile maintenance operations. A lane is blocked because of road maintenance activities. Expect delays. For the next two weeks.
I-65 northbound: Road construction. --- Citizen Update ---
Between KY 1747 and Exit 130. Multiple Waze users reported road construction.
I-65 in both directions: Intermittent lane closure, because of bridge maintenance work, delays.
At KY 1747. A lane is closed intermittently because of bridge maintenance work. Expect delays. From 9:00PM EDT to 5:00AM EDT on weekdays. For the next three weeks.
I-65 northbound: Road construction.
Between KY 1747 and Exit 130. Road construction work is in progress. Until September 5.
S Hancock St: Road closure. --- Citizen Update ---
Multiple Waze users reported a road closure.
N Hancock St: Road closure. --- Citizen Update ---
Multiple Waze users reported a road closure.
I-65 southbound: Bridge closed, because the road is being repaved, because of road maintenance activities, follow the detour signs, delays.
Between KY/IN Stateline; Milepoint 138 and Exit 137: I-64. The bridge is closed because the road is being repaved and because of road maintenance activities. Follow the detour signs. Expect delays. Until October 31.
I-65 southbound: Road construction. --- Citizen Update ---
Between Exit 137: I-64 and Exit 137: I-64. Multiple Waze users reported road construction.
I-65: Bridge construction, changing traffic patterns, follow the detour signs.
At Exit 137: I-64. Bridge construction work is in progress. Expect changing traffic patterns. Follow the detour signs. Until December 31.
W Market St: Road closure. --- Citizen Update ---
Multiple Waze users reported a road closure.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-65
Map of Reports on I-65 Between Exit 28: KY 446 and Milepoint 32. The left lane is closed due to road construction work. Expect delays. For the next month. Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017. Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018. Between Bullitt, Jefferson County Line and Exit 135. Look out for mobile maintenance operations. A lane is blocked because of road maintenance activities. Expect delays. For the next two weeks. Between KY 1747 and Exit 130. Multiple Waze users reported road construction. Between KY/IN Stateline; Milepoint 138 and Exit 137: I-64. The bridge is closed because the road is being repaved and because of road maintenance activities. Follow the detour signs. Expect delays. Until October 31.
I-65 in both directions: Left lane closed, due to road construction work, delays.
I-65 southbound: Rest area closed.
I-65 in both directions: Long term road construction, changing traffic patterns, width limit in effect, permitted oversize loads are prohibited, slow traffic, delays.
I-65 northbound: Road construction.
I-65 northbound: Car stopped on roadway.
I-65 in both directions: Long term road construction.
I-65 southbound: Road construction.
I-65 northbound: Road construction.
I-65 in both directions: Mobile maintenance operations, lane blocked, because of road maintenance activities, delays.
I-65 northbound: Road construction.
I-65 in both directions: Intermittent lane closure, because of bridge maintenance work, delays.
I-65 northbound: Road construction.
S Hancock St: Road closure.
N Hancock St: Road closure.
I-65 southbound: Bridge closed, because the road is being repaved, because of road maintenance activities, follow the detour signs, delays.
I-65 southbound: Road construction.
I-65: Bridge construction, changing traffic patterns, follow the detour signs.
W Market St: Road closure.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction Hazard Waze: Hazard
Accident Waze: Accident Closure Waze: Closure Flooding Flooding