KYTC Logo
Reports on I-65
I-65
Between Bristow Friendship Church Road and Mile Point 32 in Warren County. The left lane is closed due to long term road construction work. For the next five months.
Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. Major road construction work is in progress. The shoulder is closed. For a long period.
Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24.
Between Mile Point 112 in Bullitt County and Mile Point 118 in Bullitt County. The roadway is reduced to two lanes. Road construction work is in progress. Expect changing traffic patterns. The roadway is shared with opposing traffic. Speed limit 55 MPH. Width limit 16'0". Until December 31.
At Exit 121: KY 1526. The exit ramp is closed. The road is being repaved. A detour is in operation. Until Monday, at about 5:00PM EST.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. The roadway is reduced to one lane. Look out for construction work. From 9:00PM EDT to 5:00AM EDT on Fridays and Saturdays.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. The roadway is reduced to one lane. Look out for construction work. From 9:00PM EDT to 5:00AM EDT on Fridays and Saturdays.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. For a long period.
Between Brook Street; Muhammad Ali Boulevard and Mile Point 136 in Jefferson County. Look out for construction work. The right lane is closed. Until January 29, 2016.
Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. Look out for construction work. The roadway is reduced to two lanes. For the next six months.
Between John F Kennedy Bridge and Indiana State Line. Road construction work is in progress. The roadway is reduced to two lanes. Expect changing traffic patterns. Until October 1, 2016.