KYTC Logo
Reports on I-65
I-65
Between Exit 28: KY 446 and Milepoint 32. The left lane is closed due to road construction work. Expect delays. For the next month.
--- Citizen Update ---
At Exit 28: KY 446. A Waze user reported road construction.
--- Citizen Update ---
Between Warren, Barren County Line and KY 259. A Waze user reported road construction.
--- Citizen Update ---
Between Milepoint 48 and Exit 48. A Waze user reported road construction.
--- Citizen Update ---
Between Exit 53: KY 90 and Milepoint 53. A Waze user reported road construction.
At Milepoint 60. The rest area is closed.
Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Traffic is slow. Expect delays. Speed limit 55 MPH. Until November 1, 2017.
Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018.
--- Citizen Update ---
Between Milepoint 92 and US 31W. A Waze user reported road construction.
--- Citizen Update ---
At Milepoint 96. A Waze user reported a car stopped on the roadway.
--- Citizen Update ---
Between Milepoint 98 and Milepoint 96. A Waze user reported a car stopped on the roadway.
Between Bullitt, Jefferson County Line and Exit 135. Look out for mobile maintenance operations. A lane is blocked because of road maintenance activities. Expect delays. For the next three weeks.
At KY 1747. A lane is closed intermittently because of bridge maintenance work. Expect delays. From 9:00PM EDT to 5:00AM EDT on weekdays. For a month.
--- Citizen Update ---
At KY 1747. A Waze user reported road construction.
--- Citizen Update ---
Multiple Waze users reported a road closure.
--- Citizen Update ---
Multiple Waze users reported a road closure.
Between KY/IN Stateline; Milepoint 138 and Exit 137: I-64. The bridge is closed because the road is being repaved and because of road maintenance activities. Follow the detour signs. Expect delays. Until October 31.
At Exit 137: I-64. Bridge construction work is in progress. Expect changing traffic patterns. Follow the detour signs. Until December 31.
--- Citizen Update ---
Between Exit 137: I-64 and Exit 137: I-64. Multiple Waze users reported road construction.
--- Citizen Update ---
Multiple Waze users reported a road closure.