KYTC Logo
I-75
I-75 northbound: Road construction. --- Citizen Update ---
At Exit 41: KY 80. A Waze user reported road construction.
Deer Haven Ln: Road closure. --- Citizen Update ---
Multiple Waze users reported a road closure.
I-75 southbound: Road construction. --- Citizen Update ---
Between US 62 and Exit 125: US 460. A Waze user reported road construction.
I-75 southbound: Car stopped on roadway. --- Citizen Update ---
Between US 62 and Exit 125: US 460. A Waze user reported a car stopped on the roadway.
I-75 in both directions: Mobile maintenance operations, because of blasting work, road closed intermittently, shoulder closed, delays.
Between Milepoint 126 and Exit 129. Look out for mobile maintenance operations because of blasting work. The road is closed intermittently. The shoulder is closed. Expect delays. From 9:00AM EDT to 2:30PM EDT on Mondays, Tuesdays and Wednesdays. Until December 16.
I-75 northbound: Road construction. --- Citizen Update ---
At Milepoint 126. A Waze user reported road construction.
I-75 northbound: Construction work, left lane blocked, left center lane blocked.
Between Milepoint 126 and Exit 129. Construction work. Left lane blocked. Left center lane blocked. Starting 8:00PM EDT, 8/26/2016 until tomorrow at about 10:00PM EDT.
I-75 southbound: Car stopped on roadway. --- Citizen Update ---
At Milepoint 132. A Waze user reported a car stopped on the roadway.
Eads Rd: Lane closure. --- Citizen Update ---
A Waze user reported a lane closure.
I-75 northbound: Moderate traffic jam. --- Citizen Update ---
At Milepoint 182. A Waze user reported a moderate traffic jam.
I-75 southbound: Moderate traffic jam. --- Citizen Update ---
At Exit 182. A Waze user reported a moderate traffic jam.
I-75 northbound: Roadway reduced to two lanes, because the road is being repaved, changing traffic patterns, long delays, ramp blocked.
Between Exit 84: I-275 and Exit 188: US 25. The roadway is reduced to two lanes because the road is being repaved. Expect changing traffic patterns. Expect long delays. The ramp is blocked. Speed limit 45 MPH. Until November 30.
I-75 northbound: Road construction. --- Citizen Update ---
Between Exit 84: I-275 and Milepoint 186. Multiple Waze users reported road construction.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-75
Map of Reports on I-75 Between Milepoint 126 and Exit 129. Look out for mobile maintenance operations because of blasting work. The road is closed intermittently. The shoulder is closed. Expect delays. From 9:00AM EDT to 2:30PM EDT on Mondays, Tuesdays and Wednesdays. Until December 16. Between Exit 84: I-275 and Exit 188: US 25. The roadway is reduced to two lanes because the road is being repaved. Expect changing traffic patterns. Expect long delays. The ramp is blocked. Speed limit 45 MPH. Until November 30.
I-75 northbound: Road construction.
Deer Haven Ln: Road closure.
I-75 southbound: Road construction.
I-75 southbound: Car stopped on roadway.
I-75 in both directions: Mobile maintenance operations, because of blasting work, road closed intermittently, shoulder closed, delays.
I-75 northbound: Road construction.
I-75 northbound: Construction work, left lane blocked, left center lane blocked.
I-75 southbound: Car stopped on roadway.
Eads Rd: Lane closure.
I-75 northbound: Moderate traffic jam.
I-75 southbound: Moderate traffic jam.
I-75 northbound: Roadway reduced to two lanes, because the road is being repaved, changing traffic patterns, long delays, ramp blocked.
I-75 northbound: Road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction Hazard Waze: Hazard
Accident Waze: Accident Closure Waze: Closure Flooding Flooding