KYTC Logo
I-24
I-24 in both directions: Lane blocked, road construction, delays.
Between the start of I-24 and Exit 4: US 60. A lane is blocked. Road construction work is in progress. Expect delays. Speed limit 55 MPH. From 8:00PM EDT to 6:00AM EDT on weekdays. Until August 1.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-24
Map of Reports on I-24 Between the start of I-24 and Exit 4: US 60. A lane is blocked. Road construction work is in progress. Expect delays. Speed limit 55 MPH. From 8:00PM EDT to 6:00AM EDT on weekdays. Until August 1.
I-24 in both directions: Lane blocked, road construction, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info