KYTC Logo
KY 61
KY 61 in both directions: Road construction, lane blocked.
Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period.
KY 61 in both directions: Road construction, lane closed, delays.
At I-265. Road construction work is in progress. A lane is closed. Expect delays. From 7:00PM EDT to 5:00AM EDT daily. For a long period.
KY 61: Road maintenance operations, lane closed.
Between Glenrose Road and Tower Road. Road maintenance work is in progress. A lane is closed. From 9:00AM EDT to 3:00PM EDT on weekdays. Clearing this week.
KY 61 in both directions: Road maintenance operations, lane blocked.
Between Woodbine Street and Muhammad Ali B0Ulivard. Road maintenance work is in progress. A lane is blocked. From 9:00AM EDT to 3:00PM EDT on weekdays. For the next week.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on KY 61
Map of Reports on KY 61 Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period. Between Glenrose Road and Tower Road. Road maintenance work is in progress. A lane is closed. From 9:00AM EDT to 3:00PM EDT on weekdays. Clearing this week. Between Woodbine Street and Muhammad Ali B0Ulivard. Road maintenance work is in progress. A lane is blocked. From 9:00AM EDT to 3:00PM EDT on weekdays. For the next week.
KY 61 in both directions: Road construction, lane blocked.
KY 61 in both directions: Road construction, lane closed, delays.
KY 61: Road maintenance operations, lane closed.
KY 61 in both directions: Road maintenance operations, lane blocked.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info