KYTC Logo
I-75
I-75 northbound: Road construction. --- Citizen Update ---
At Exit 41: KY 80. A Waze user reported road construction.
I-75 northbound: Road construction. --- Citizen Update ---
Between Milepoint 74 and Exit 76: KY 21. A Waze user reported road construction.
I-75 northbound: Car stopped on roadway. --- Citizen Update ---
Between Milepoint 74 and Exit 76: KY 21. A Waze user reported a car stopped on the roadway.
Deer Haven Ln: Road closure. --- Citizen Update ---
Multiple Waze users reported a road closure.
I-75 in both directions: Mobile maintenance operations, because of blasting work, road closed intermittently, shoulder closed, delays.
Between Milepoint 126 and Exit 129. Look out for mobile maintenance operations because of blasting work. The road is closed intermittently. The shoulder is closed. Expect delays. From 9:00AM EDT to 2:30PM EDT on Mondays, Tuesdays and Wednesdays. Until December 16.
I-75 northbound: Road construction. --- Citizen Update ---
Between Milepoint 126 and Exit 129. A Waze user reported road construction.
I-75 southbound: Road construction. --- Citizen Update ---
Between Exit 129 and Milepoint 126. A Waze user reported road construction.
Eads Rd: Lane closure. --- Citizen Update ---
A Waze user reported a lane closure.
I-75 northbound: Roadway reduced to two lanes, because the road is being repaved, changing traffic patterns, long delays, ramp blocked.
Between Exit 84: I-275 and Exit 188: US 25. The roadway is reduced to two lanes because the road is being repaved. Expect changing traffic patterns. Expect long delays. The ramp is blocked. Speed limit 45 MPH. Until November 30.
I-75 northbound: Road construction. --- Citizen Update ---
Between Exit 84: I-275 and Milepoint 186. Multiple Waze users reported road construction.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-75
Map of Reports on I-75 Between Milepoint 126 and Exit 129. Look out for mobile maintenance operations because of blasting work. The road is closed intermittently. The shoulder is closed. Expect delays. From 9:00AM EDT to 2:30PM EDT on Mondays, Tuesdays and Wednesdays. Until December 16. Between Exit 84: I-275 and Exit 188: US 25. The roadway is reduced to two lanes because the road is being repaved. Expect changing traffic patterns. Expect long delays. The ramp is blocked. Speed limit 45 MPH. Until November 30.
I-75 northbound: Road construction.
I-75 northbound: Road construction.
I-75 northbound: Car stopped on roadway.
Deer Haven Ln: Road closure.
I-75 in both directions: Mobile maintenance operations, because of blasting work, road closed intermittently, shoulder closed, delays.
I-75 northbound: Road construction.
I-75 southbound: Road construction.
Eads Rd: Lane closure.
I-75 northbound: Roadway reduced to two lanes, because the road is being repaved, changing traffic patterns, long delays, ramp blocked.
I-75 northbound: Road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction Hazard Waze: Hazard
Accident Waze: Accident Closure Waze: Closure Flooding Flooding