KYTC Logo
KY 61
KY 61 in both directions: Road construction, lane blocked.
Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period.
KY 61 in both directions: Lane blocked, road construction.
Between Maple Spring Drive and I-265. A lane is blocked. Road construction work is in progress. From 7:00PM EDT to 5:00AM EDT on weekdays. For a month.
KY 61 in both directions: Lane blocked, because of utility work, delays.
Between South Park Road; East Manslick Drive and Oaklawn Drive. A lane is blocked because of utility work. Expect delays. From 7:00PM EDT to 6:00AM EDT on weekdays. For a month.
KY 61 southbound: Roadway reduced to one lane, because the road is being repaved.
Between Lampton Street and S Preston Street. The roadway is reduced to one lane because the road is being repaved. From 8:00AM EDT to 6:00PM EDT on weekdays.
KY 61 southbound: Roadway reduced to one lane, paving operations, delays.
Between Muhammad Ali B0Ulivard and US 60; Broadway. The roadway is reduced to one lane. The road is being repaved. Expect delays. From 7:00PM EDT to 6:00AM EDT on weekdays. For a month.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on KY 61
Map of Reports on KY 61 Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period. Between Maple Spring Drive and I-265. A lane is blocked. Road construction work is in progress. From 7:00PM EDT to 5:00AM EDT on weekdays. For a month. Between South Park Road; East Manslick Drive and Oaklawn Drive. A lane is blocked because of utility work. Expect delays. From 7:00PM EDT to 6:00AM EDT on weekdays. For a month. Between Lampton Street and S Preston Street. The roadway is reduced to one lane because the road is being repaved. From 8:00AM EDT to 6:00PM EDT on weekdays. Between Muhammad Ali B0Ulivard and US 60; Broadway. The roadway is reduced to one lane. The road is being repaved. Expect delays. From 7:00PM EDT to 6:00AM EDT on weekdays. For a month.
KY 61 in both directions: Road construction, lane blocked.
KY 61 in both directions: Lane blocked, road construction.
KY 61 in both directions: Lane blocked, because of utility work, delays.
KY 61 southbound: Roadway reduced to one lane, because the road is being repaved.
KY 61 southbound: Roadway reduced to one lane, paving operations, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info