KYTC Logo
Reports on I-471
I-471
Between Mile Point 0 in Campbell County and Ohio State Line. Look out for long term road construction work. The roadway is reduced to two lanes. A mandatory speed limit is in force. Expect delays. Traffic is stop and go. Look out for a slow moving maintenance vehicle. From 5:00AM EDT to 2:00PM EDT daily. For the next four months.
Between Exit 1 and Exit 2: US 27; US 27. Road construction work is in progress. The road is blocked. Until June 30.
Between Mile Point 4 in Campbell County and Exit 5: KY 8. Road construction work is in progress. The road is blocked. Until July 30.
Between Mile Point 4 in Campbell County and Exit 5: KY 8. Road construction work is in progress. The road is blocked. Until May 30.