KYTC Logo
Reports on Purchase Parkway
Purchase Parkway
Between Exit 21: US 45B and Exit 52A-B: I-24. Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Expect delays. Width limit 15'0". Speed limit 55 MPH. Until July 1, 2018.
At Exit 43. The road is being repaved. On ramps. Expect delays. Until November 15.
At Exit 52A-B: I-24. Traffic is stop and go. On ramps because of construction work. Look out for flaggers. Expect delays. Traffic fines are doubled. Speed limit 55 MPH. Until August 1.