KYTC Logo
Reports on Purchase Parkway
Purchase Parkway
Between Exit 21: US 45B and Milepoint 20. There is a width limit in effect due to road construction work. Speed restrictions are in force. Width limit 13'0". Speed limit 45 MPH. For a long period.
Between Exit 21: US 45B and Exit 52A-B: I-24. Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Expect delays. Width limit 15'0". Speed limit 55 MPH. Until July 1, 2018.
At Exit 43. The road is being repaved. On ramps. Expect changing traffic patterns. There is a width limit in effect. Expect delays. Width limit 12'0". Until November 15.