KYTC Logo
Reports on Purchase Parkway
Purchase Parkway
Between Exit 21: US 45B and Milepoint 20. There is a width limit in effect due to road construction work. Speed restrictions are in force. Width limit 13'0". Speed limit 45 MPH. For a long period.
Between Exit 21: US 45B and Exit 52A-B: I-24. Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Expect delays. Width limit 15'0". Speed limit 55 MPH. Until July 1, 2018.
At Exit 22: KY 80; KY 80X. Ramp restrictions are in force because the road is being repaved and due to road construction work. Be aware of narrow lanes. Look out for flaggers. Fines are double in the work zone. Speed limit 55 MPH. Until tomorrow at about 11:59PM EDT.
At Exit 43. The road is being repaved. On ramps. Expect delays. Until November 15.
At Exit 52A-B: I-24. Traffic is stop and go. On ramps because of construction work. Look out for flaggers. Expect delays. Traffic fines are doubled. Speed limit 55 MPH. Until Monday, at about 11:59PM EDT.