KYTC Logo
I-75
I-75 in both directions: Roadway reduced to one lane, because the road is being repaved, delays of uncertain duration.
Between Mile Point 64 in Rockcastle County and Mile Point 68 in Rockcastle County. The roadway is reduced to one lane because the road is being repaved. Expect delays of uncertain duration. From 6:00PM EDT to 12:00PM EDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays. Until June 30.
I-75 southbound: Lane blocked, paving operations, delays, slow traffic.
Between Mile Point 98 in Fayette County and Mile Point 82 in Madison County. Lane blocked. Paving operations. Delays. Slow traffic. From 6:00AM EDT to 10:00PM EDT and from 10:00PM EDT to 6:00AM EDT on weekdays. Starting 10:00PM EDT, 3/30/2015 until June 30.
I-75 southbound: Paving operations, left lane closed, delays.
Between Mile Point 98 in Fayette County and Mile Point 82 in Madison County. The road is being repaved. The left lane is closed. Expect delays. Until today at about 10:00PM EDT.
I-75 in both directions: Road maintenance operations, intermittent lane closure, delays.
Between Scott, Grant County Line and I-71; Ohio State Line. Road maintenance work is in progress. A lane is closed intermittently. Expect delays. From 8:00PM EDT to 4:00AM EDT daily. Until Friday, at about 4:00AM EDT.
I-75 in both directions: Road construction, paving operations, lane blocked, delays.
Between Mile Point 152 in Grant County and Mile Point 166 in Grant County. Road construction work is in progress. The road is being repaved. A lane is blocked. Expect delays. Until June 30.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-75
Map of Reports on I-75 Between Mile Point 64 in Rockcastle County and Mile Point 68 in Rockcastle County. The roadway is reduced to one lane because the road is being repaved. Expect delays of uncertain duration. From 6:00PM EDT to 12:00PM EDT on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays. Until June 30. Between Mile Point 98 in Fayette County and Mile Point 82 in Madison County. Lane blocked. Paving operations. Delays. Slow traffic. From 6:00AM EDT to 10:00PM EDT and from 10:00PM EDT to 6:00AM EDT on weekdays. Starting 10:00PM EDT, 3/30/2015 until June 30. Between Mile Point 98 in Fayette County and Mile Point 82 in Madison County. The road is being repaved. The left lane is closed. Expect delays. Until today at about 10:00PM EDT. Between Scott, Grant County Line and I-71; Ohio State Line. Road maintenance work is in progress. A lane is closed intermittently. Expect delays. From 8:00PM EDT to 4:00AM EDT daily. Until Friday, at about 4:00AM EDT. Between Scott, Grant County Line and I-71; Ohio State Line. Road maintenance work is in progress. A lane is closed intermittently. Expect delays. From 8:00PM EDT to 4:00AM EDT daily. Until Friday, at about 4:00AM EDT. Between Scott, Grant County Line and I-71; Ohio State Line. Road maintenance work is in progress. A lane is closed intermittently. Expect delays. From 8:00PM EDT to 4:00AM EDT daily. Until Friday, at about 4:00AM EDT. Between Mile Point 152 in Grant County and Mile Point 166 in Grant County. Road construction work is in progress. The road is being repaved. A lane is blocked. Expect delays. Until June 30.
I-75 in both directions: Roadway reduced to one lane, because the road is being repaved, delays of uncertain duration.
I-75 southbound: Lane blocked, paving operations, delays, slow traffic.
I-75 southbound: Paving operations, left lane closed, delays.
I-75 in both directions: Road maintenance operations, intermittent lane closure, delays.
I-75 in both directions: Road construction, paving operations, lane blocked, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info