KYTC Logo
KY 61
KY 61 in both directions: Road construction, lane blocked.
Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period.
KY 61 southbound: Construction work, changing traffic patterns.
At KY 1526. Look out for construction work. Expect changing traffic patterns. Until April 1.
KY 61 in both directions: Lane blocked, road construction.
Between Maple Spring Drive and I-265. A lane is blocked. Road construction work is in progress. From 7:00PM EST to 5:00AM EST on weekdays. For the next two weeks.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on KY 61
Map of Reports on KY 61 Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period. Between Maple Spring Drive and I-265. A lane is blocked. Road construction work is in progress. From 7:00PM EST to 5:00AM EST on weekdays. For the next two weeks.
KY 61 in both directions: Road construction, lane blocked.
KY 61 southbound: Construction work, changing traffic patterns.
KY 61 in both directions: Lane blocked, road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info