Map of Statewide Between Exit 1 and Exit 5: KY 8. Road maintenance work is in progress. The roadway is reduced to two lanes. For the next month. Between Daviess, Hancock County Line and Toler Bridge Road. Bridge maintenance work is in progress. The roadway is reduced to one lane. The roadway is shared with opposing traffic. For the next three weeks. Between Mile Point 154 in Carter County and Mile Point 168 in Carter County. Look out for construction work. The roadway is reduced to one lane. Speed restrictions are in force. Expect delays. Watch. For. Be aware of narrow lanes. Until June 30. Between Exit 30: KY 146 and Exit 35: KY 841; I-71. The road is being repaved. The roadway is reduced to one lane. From 12:00AM EDT to 12:00PM EDT on weekends and from 8:00PM EDT to 6:00AM EDT on Mondays, Tuesdays, Wednesdays and Thursdays. Between Exit 87: KY 876 and Exit 97: US 25. The right lane is blocked because the road is being repaved. Expect delays. Observe the signs. From 9:00AM EDT to 3:00PM EDT on weekdays. For the next week. Between Franklin, Woodford County Line and US 62; Mile Point 8 in Woodford County. The road is being repaved. The roadway is reduced to one lane. Expect delays of uncertain duration. Until November 15. Between Mile Point 44 in Edmonson County and Edmonson, Barren County Line. There is work on the shoulder. The left lane is closed. Until Saturday, at about 5:00PM EDT. Between Mile Point 0 in Campbell County and Ohio State Line. Look out for long term road construction work. The roadway is reduced to two lanes. A mandatory speed limit is in force. Expect delays. Traffic is stop and go. Look out for a slow moving maintenance vehicle. From 5:00AM EDT to 2:00PM EDT daily. For the next three months. Between Henry, Trimble County Line and Mile Point 56 in Gallatin County. Road maintenance work is in progress. A lane is closed. Expect delays. From 7:00PM EDT to 10:00AM EDT on weekdays. For the next three weeks. Between Mile Point 116 in Bath County and Mile Point 124 in Bath County. Road maintenance work is in progress. The roadway is reduced to one lane. Reduce your speed. Until July 1. Between Old KY 151 Loop Number 1 and I-64. Road maintenance work is in progress. A lane is closed. Expect delays. For the next week. Between Mile Point 10 in Clark County and Clark, Powell County Line. Bridge construction work is in progress. The roadway is reduced to one lane. Expect delays. Drive carefully. Until September 6. Between Mile Point 134 in Rowan County and Mile Point 138 in Rowan County. Road maintenance work is in progress. The roadway is reduced to one lane. Reduce your speed. Until July 1. Between Exit 175: KY 338; Richwood Road and Boone, Kenton County Line. Road construction work is in progress. A lane is blocked. Until June 30. Between Mile Point 64 in Rockcastle County and Mile Point 70 in Rockcastle County. Road maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Fines are double in the work zone. For the next three weeks. Between KY 122 and US 23. Road maintenance work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Until August 31. Between Mile Point 10 in Daviess County and KY 81. Road construction work is in progress. Expect changing traffic patterns. Look out for flaggers. For the next two months. Between Exit 3: KY 305 and US 68; Mile Point 16 in McCracken County. Road construction work is in progress. A lane is blocked. Speed restrictions are in force. Fines are double in the work zone. Until September 1. Between Nelson, Washington County Line and KY 53. Major road construction work is in progress. A lane is closed. Until July 31. Between Mile Point 104 in Fayette County and Mile Point 108 in Fayette County. The road is being repaved. The roadway is reduced to two lanes. Look out for traffic congestion. Fines are double in the work zone. Speed limit 55 MPH. Until July 15. Between Mile Point 18 in Jefferson County and Mile Point 22 in Jefferson County. Road maintenance work is in progress. A lane is closed. Expect delays. Speed restrictions are in force. Fines are double in the work zone. From 8:00PM EDT to 6:00AM EDT on Mondays, Tuesdays and Wednesdays. Until July 31. Between Brentlinger Lane; Cedar Creek Road and I-265; Gene Snyder Freeway. Road construction work is in progress. A lane is closed. Expect delays. Speed restrictions are in force. From 8:00PM EDT to 5:00AM EDT on weekdays. Until November 15. Between Exit 126 and Exit 136. Road construction work is in progress. A lane is blocked. Expect delays. Observe the signs. Until August 22. Between Mile Point 8 in Jefferson County and Jefferson, Oldham County Line. The right lane is blocked. The road is being repaved. From 6:30PM EDT to 12:00AM EDT on Tuesday and Thursday. Until today at about 11:59PM EDT. Between Bayly Avenue and Meridian Avenue. The road is being repaved. A lane is blocked. Expect delays. From 7:30AM EDT to 4:30PM EDT on weekdays. Until Monday, at about 11:59PM EDT. Between Exit 86: US 41A and Tennessee State Line. Road construction work is in progress. A lane is blocked. Speed restrictions are in force. Fines are double in the work zone. There is a width limit in effect. Width limit 16'0". Until October 13. Between Brunerstown Road and Old Brunerstown Road. Road construction work is in progress. The road is being repaved. A lane is blocked. Clearing this week. Between Mile Point 38 in Lyon County and Exit 45: KY 293. Road construction work is in progress. Bridge maintenance work is in progress. A lane is blocked. Speed restrictions are in force. There is a width limit in effect. Fines are double in the work zone. Width limit 13'0". For the next five months. Between Gordon Lane and I-64. Road construction work is in progress. A lane is closed. Expect delays. Clearing this week. Between Exit 43: LN and Exit 53: KY 70. Major road construction work is in progress. Until August 30. Between Mile Point 16 in Larue County and Blanton Road. The roadway is reduced to one lane. Look out for temporary traffic lights. Look out for long term road construction work. Until September 1. Between Casey Circle and KY 876. Look out for construction work. The roadway is reduced to one lane. Traffic is slow. Expect changing traffic patterns. Observe the signs. From 9:00AM EDT to 3:00PM EDT on weekdays. Until June 30. Between Exit 28: KY 1848; Veechdale Road and KY 2861; Zaring Mill Road. Major road construction work is in progress. A lane is closed. Expect delays. Speed restrictions are in force. Fines are double in the work zone. From 10:00PM EDT to 5:00AM EDT on Saturdays and from 7:00PM EDT to 5:00AM EDT on weekdays and Sundays. For the next three months. Between Mile Point 8 in Daviess County and US 60; US 60. Road construction work is in progress. The roadway is reduced to one lane. Until August 15. Between KY 55; KY 53 and KY 1871. Road marking work is in progress. A lane is blocked. Expect delays. Clearing this week. Between BG; KY 2863 and New Circle Road. Major road construction work is in progress. Expect changing traffic patterns. Truck restrictions are in force. Speed restrictions are in force. Fines are double in the work zone. Expect delays. Consider using an alternate route. For the next five months. Between Mile Point 36 in Henry County and Mile Point 56 in Gallatin County. The road is being repaved. A lane is closed. Expect delays. From 7:00PM EDT to 10:00AM EDT on weekdays. Until August 31.
US 60: Bridge maintenance operations, single line traffic - alternating directions, observe signals, delays.
I-471 southbound: Road maintenance operations, roadway reduced to two lanes.
US 60 in both directions: Bridge maintenance operations, roadway reduced to one lane, opposing traffic sharing the roadway.
I-275 southbound: Long term road construction, right lane closed, delays.
I-64 in both directions: Construction work, roadway reduced to one lane, speed restrictions in force, delays, watch, for, narrow lanes.
US 42 in both directions: Road construction, lane blocked.
I-265 in both directions: Paving operations, roadway reduced to one lane.
I-75 in both directions: Right lane blocked, because the road is being repaved, delays, observe signs.
US 60 in both directions: Posted bridge.
US 60 in both directions: Paving operations, roadway reduced to one lane, delays of uncertain duration.
I-65 southbound: Work on the shoulder, left lane closed.
I-471 southbound: Long term road construction, roadway reduced to two lanes, a mandatory speed limit is in force, delays, stop and go traffic, slow moving maintenance vehicle.
I-71 in both directions: Road maintenance operations, lane closed, delays.
I-64: Road maintenance operations, roadway reduced to one lane, reduce your speed.
KY 151: Road maintenance operations, lane closed, delays.
MP in both directions: Bridge construction, roadway reduced to one lane, delays, drive carefully.
I-64: Road maintenance operations, roadway reduced to one lane, reduce your speed.
US 23S in both directions: Bridge maintenance operations, changing traffic patterns, opposing traffic sharing the roadway.
I-471 southbound: Road maintenance operations, entrance ramp closed.
I-275 westbound: Road construction, road blocked.
I-75 southbound: Road construction, lane blocked.
I-471 southbound: Road construction, road blocked.
I-75 in both directions: Road maintenance operations, roadway reduced to one lane, speed restrictions in force, fines are double in the work zone.
KY 80 in both directions: Road maintenance operations, roadway reduced to one lane, speed restrictions in force.
KY 56: Road construction, changing traffic patterns, look out for flaggers.
I-64 westbound: Bridge maintenance operations, roadway reduced to one lane.
I-24: Road construction, lane blocked, speed restrictions in force, fines are double in the work zone.
I-64 westbound: Bridge maintenance operations, right lane of exit ramp blocked, delays, consider using an alternate route.
US 150: Bridge construction, delays of uncertain duration, speed restrictions in force.
I-471 southbound: Road construction, road blocked.
BG in both directions: Major road construction, lane closed.
I-75 northbound: Paving operations, roadway reduced to two lanes, traffic congestion, fines are double in the work zone.
US 127 in both directions: Road maintenance operations, lane blocked, delays.
US 421: Construction work, truck restrictions in force.
I-264: Road maintenance operations, lane closed, delays, speed restrictions in force, fines are double in the work zone.
I-64 eastbound: Road construction, exit ramp closed.
US 31E in both directions: Road construction, lane closed, delays, speed restrictions in force.
I-75: Road construction, lane blocked, delays, observe signs.
I-275 northbound: Exit ramp closed, detour in operation.
I-71 southbound: Right lane blocked, paving operations.
US 60 in both directions: Paving operations, lane blocked, delays.
US 45 in both directions: Construction work, single line traffic - alternating directions, consider using an alternate route.
I-471 southbound: Road construction, road closed.
I-24 in both directions: Road construction, lane blocked, speed restrictions in force, fines are double in the work zone, width limit in effect.
--- Starting tomorrow at 9:00AM EDT --- I-71 southbound: Bridge inspection work is in progress, lane blocked.
KY 55 in both directions: Road construction, paving operations, lane blocked.
I-24 in both directions: Road construction, bridge maintenance operations, lane blocked, speed restrictions in force, width limit in effect, fines are double in the work zone.
US 231 in both directions: Bridge maintenance operations, roadway reduced to one lane.
KY 55: Road construction, lane closed, delays.
I-65 in both directions: Major road construction.
KY 80 in both directions: Road closed, mudslide.
US 31E: Roadway reduced to one lane, temporary traffic lights, long term road construction.
HR in both directions: Shoulder closed, due to long term road construction work, reduce your speed, trucks are entering the roadway.
US 25 in both directions: Construction work, roadway reduced to one lane, slow traffic, changing traffic patterns, observe signs.
I-64 in both directions: Major road construction, lane closed, delays, speed restrictions in force, fines are double in the work zone.
US 60B westbound: Road construction, roadway reduced to one lane.
US 60 in both directions: Road marking operations, lane blocked, delays.
US 60 in both directions: Major road construction, changing traffic patterns, truck restrictions in force, speed restrictions in force, fines are double in the work zone, delays, consider using an alternate route.
I-71 in both directions: Paving operations, lane closed, delays.
KY 9: Bridge maintenance operations, lane closed, delays.