Road Reports—Statewide
Map of Statewide Between Exit 137: I-64 and Milepoint 138. The bridge is closed. Repairs are in progress. A detour is in operation. For the next five months. Between I-71 and KY 146. Road construction work is in progress. Expect delays. Speed limit 45 MPH. From 6:00PM EST to 6:00AM EST and from 9:00AM EST to 3:00PM EST daily. Until June 30, 2017. Between I-65; Cardin Ln and Mile Point 4 in Larue County. Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Until May 31. Between Milepoint 82 and US 31W. Look out for long term road construction work. Until November 30, 2018. Between W Broadway and S 1st St. A lane is closed because of road maintenance activities. Expect delays. From 9:00AM EST to 3:00PM EST on weekdays. For the next week. Between Milepoint 26 and Milepoint 32. Major road construction work is in progress. Blasting is in progress. Expect delays of uncertain duration. Speed limit 45 MPH. For a long period. Between Exit 7: US 42 and Milepoint 8. Multiple Waze users reported standstill traffic. Between Interstate Plaza Rd and Harper Cemetery Rd. Bridge construction work is in progress. Construction traffic may be merging. Until April 30. Between Milepoint 64 and Milepoint 82. Look out for long term road construction work. Expect changing traffic patterns. There is a width limit in effect. Permitted oversize loads are prohibited. Speed limit 55 MPH. Until November 1, 2017. Between Exit 32 and Exit 35A: I-71. Road construction work is in progress. A lane is closed intermittently. Expect delays. Until November 30. Between the start of I-24 and Milepoint 2. Bridge maintenance work is in progress. The roadway is reduced to one lane. The road is closed intermittently. Expect delays. Until May 30. Between Exit 21: US 45B and Exit 52A-B: I-24. Road construction work is in progress. Road maintenance work is in progress. A lane is blocked. There is a width limit in effect. Expect delays. Width limit 15'0". Speed limit 55 MPH. Until March 31.
I-65 in both directions: Bridge closed, repairs are in progress, detour in operation.
KY 393 in both directions: Road construction, delays.
KY 152 in both directions: Bridge closed, road closed for repairs, detour in operation.
US 31W in both directions: Bridge construction, roadway reduced to one lane, width limit in effect.
I-65 in both directions: Long term road construction.
Purchase Parkway in both directions: Roadway reduced to one lane, road construction, delays.
I-71 northbound: Road closure.
I-65: Bridge construction, paving operations, changing traffic patterns, delays of uncertain duration.
I-64 eastbound: Exit ramp closed, due to road construction work, delays, follow the detour signs.
I-65 southbound: Rest area closed.
US 150: Lane closed, because of road maintenance activities, delays.
KY 44 in both directions: Road maintenance operations, shoulder closed, delays.
KY 1747 in both directions: Road construction, lane closed, delays.
Mountain Parkway Extension in both directions: Major road construction, blasting, delays of uncertain duration.
KY 9 in both directions: Road construction, lane blocked, delays.
KY 61 in both directions: Road construction, lane blocked, delays.
I-64 eastbound: Standstill traffic.
KY 55 in both directions: Lane blocked, due to bridge construction work, delays.
I-64 westbound: Road closure, construction work.
I-265 in both directions: Roadway reduced to one lane, work on underground services, delays.
US 31W in both directions: Bridge construction, construction traffic merging.
I-65 in both directions: Long term road construction, changing traffic patterns, width limit in effect, permitted oversize loads are prohibited.
I-265: Road construction, intermittent lane closure, delays.
I-71: Road construction, lane blocked, delays.
I-24 eastbound: Bridge maintenance operations, roadway reduced to one lane, road closed intermittently, delays.
KY 55 in both directions: Road blocked, due to bridge construction work, detour in operation.
Purchase Parkway in both directions: Road construction, road maintenance operations, lane blocked, width limit in effect, delays.
KY 305: Road closed to traffic, due to bridge construction work, detour in operation, observe signs.
KY 36 in both directions: Bridge construction, roadway reduced to one lane, single line traffic - alternating directions, delays, look out for flaggers.
I-65 northbound: Roadway reduced to two lanes, construction work.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info
Moderate Traffic Waze: Moderate Traffic Heavy Traffic Waze: Heavy / Standstill Traffic Weather Waze: Weather Construction Waze: Construction Hazard Waze: Hazard
Accident Waze: Accident Closure Waze: Closure