KYTC Logo
I-71 southbound: Road construction.
I-71 southbound: Road construction.
Between Mile Point 28 in Henry County and Henry, Trimble County Line. Road construction work is in progress. The road is being repaved. A lane is blocked. Traffic is heavy. Expect long delays. Speed restrictions are in force. Fines are double in the work zone. The ramp is blocked. There is a width limit in effect. Speed limit 55 MPH. Width limit 13'0". Until October 31.
Last updated on August 23